Monday, July 20, 2026
Total SDS
Verified This Month
12
Pending Review
5
Subs Enrolled
Rodriguez Electric verified 3 SDS sheets
Jul 18
New SDS uploaded: Quikrete Concrete Mix
Jul 17
Peak Concrete flagged missing SDS: Sika Grout
Jul 16
ABC Construction assigned SDS review to Desert Plumbing
Jul 15
Compliance report generated for Sunrise Tower
Jul 14
SJ
Sarah
🔍
SJ
SJ
Sarah
Sunrise Tower — Pre-Work SDS Verification
📅 Due: Jul 25, 2026
2/3 Complete
✅ Rodriguez Electric ✅ Peak Concrete ⏳ Desert Plumbing
67%
Mesa Business Park — Monthly SDS Audit
📅 Due: Aug 1, 2026
0/5 Complete
⏳ All subs (5)
0%
Chandler Remodel — Final SDS Sign-off
📅 Due: Jul 20, 2026
✅ Complete
✅ Valley Mechanical
100%
SJ
Sarah
Structural Steel Shop Drawings
✅ Approved
🏗️ Rodriguez Electric 📍 Sunrise Tower 📅 Jul 10, 2026
Approved by: Sarah Johnson
Concrete Mix Design Report
🔄 Under Review
🏗️ Peak Concrete 📍 Sunrise Tower 📅 Jul 15, 2026
Reviewing: EOR
Electrical Panel Specifications
⚠️ Revise & Resubmit
🏗️ Rodriguez Electric 📍 Mesa Business Park 📅 Jul 8, 2026
Comments: 2 items to address
HVAC Equipment Product Data
✅ Approved
🏗️ Valley Mechanical 📍 Chandler Remodel 📅 Jul 3, 2026
Approved by: Sarah Johnson
Waterproofing Material Data
📋 Pending Submission
🏗️ Desert Plumbing 📍 Sunrise Tower 📅 Due: Jul 28, 2026
Awaiting submittal from sub